    Pre-Approved ADU Plans in California: What They Save—and What Your Lot Still Needs

    By Vidushi Jain, zHeight

    Last updated: November 16, 2026

    AI-generated concept of a detached backyard ADU with planning drawings; not a city-approved plan or completed zHeight project
    AI-generated design illustration—not a city-approved plan or a completed zHeight project.

    Quick answer: pre-approved plans do not approve your lot

    Pre-approved ADU plans can reduce repeated building-design review and, in some programs, the cost of obtaining standard drawings. They do not replace a property-specific building permit. The site plan, utilities, agency approvals and applicable fees still need attention. A free plan is a starting point, not a free or fully permitted ADU.

    This educational guide helps California homeowners compare pre-approved ADU plans with custom design, understand the costs that remain and prepare questions for their permitting agency. Verified programs in San Ramon, Union City and unincorporated Santa Clara County illustrate how local pathways differ; they are examples, not statewide rules or a complete directory.

    Outside California, use the same comparison questions but confirm your own jurisdiction's rules. A plan's acceptance, permitted modifications and required site documents are local decisions. zHeight is a residential design and permit consulting company—not a builder or contractor. We help homeowners evaluate design and permitting needs in our service areas; construction is arranged separately.

    What “pre-approved” actually means

    A local program reviews a standard set of building drawings in advance. That can avoid repeating some review when the accepted design is used on a qualifying property. Program names differ: “pre-approved,” “permit-ready” and similar labels describe local pathways, not permission to begin construction.

    Union City distinguishes independent plan pre-approval from a site-specific application. Its checklist explicitly says each property still requires a separate building permit application, with site requirements checked during that process. Union City: Submittal Checklist & Requirements

    Before choosing a drawing set, ask the permitting agency whether that exact version remains accepted under the applicable code cycle, whether your site can use it, and which additional documents are required. Do not assume a plan accepted by one city is accepted by another.

    What the plans may save—and what remains

    Building design review
    Potential benefit: A listed plan has already undergone review within its local program.
    Still needed: Confirm current acceptance, permitted versions and the applicable code cycle.
    Design budget
    Potential benefit: Some public programs offer plan files free of charge.
    Still needed: Site documentation, specialist reports, agency fees and construction remain separate.
    Property fit
    Potential benefit: A standard footprint lets you compare layouts before commissioning custom drawings.
    Still needed: Verify placement, easements, utilities, access and any property-specific constraints.
    Permit application
    Potential benefit: The program may reduce repeated review of the standard building design.
    Still needed: Submit the required property-specific application and obtain the building permit.
    Changes to the layout
    Potential benefit: Using the accepted plan unchanged preserves its program pathway.
    Still needed: Ask the agency before modifying a plan; some programs disqualify modified designs.

    These distinctions come from the official programs below. Neither a fixed dollar saving nor a universal permit timeline is promised: site conditions, application completeness and the chosen program affect the outcome.

    Local examples: how three pre-approved ADU programs differ

    These examples show why homeowners should check plan availability, eligibility, modification limits and remaining documents separately. Their plan sizes, prices and conditions apply only to the named program—not every California city.

    San Ramon: free city plans with a fixed design

    San Ramon lists three one-bedroom, one-bathroom floor plans ranging from 560 to 708 square feet, with Craftsman, Mediterranean and Suburban Ranch styles, free to San Ramon homeowners. Its page says the plans include drawings, structural calculations and preliminary energy calculations.

    The homeowner still provides a valid site plan and title-sheet information, obtains construction permits and outside-agency approvals, pays fees, completes inspections and obtains a certificate of occupancy. The city states these plans cannot be revised and must be permitted as designed. Confirm current availability and acceptance before selecting a file. San Ramon: City Permit Ready ADU Plans

    For wider local context, read our San Ramon ADU design and permit guide.

    Santa Clara County: county plans for unincorporated properties

    The county lists free public-use plans for residents of unincorporated Santa Clara County: an 800-square-foot, two-bedroom, one-bathroom option and a 1,200-square-foot, three-bedroom, two-bathroom option, with listed style choices. This is a county program, not automatic acceptance inside an incorporated city.

    The county calls for a project-specific site plan, energy calculations and a roof truss design. Staff review site-specific zoning and energy-code factors. Its page also lists minimum plan-review fees for unmodified county plans, so “free plans” does not mean “no review fee.” Confirm the current schedule directly. Santa Clara County: Pre-Approved ADU Program

    Use our Santa Clara County guide to distinguish county jurisdiction from city permitting.

    Union City: pre-approval plus a separate site permit

    Union City's program covers detached ADU plans. Its independent-application pathway allows a design to be reviewed before a particular site is selected; each property then goes through its own building permit application. The site-specific pathway uses a qualifying accepted plan for a particular property.

    The checklist warns that site-specific modifications to pre-approved plans disqualify the project from that program. Before assuming a window, wall or foundation change is allowed, ask the city how the proposed change would be reviewed. Union City: Pre-Approved ADU Program; Union City: Submittal Checklist & Requirements

    Read our Union City ADU guide for utility coordination and local submission context.

    Budget beyond the plan files

    Compare complete scopes, not the price of a PDF. Keep four budget categories separate: plan access or licensing; property-specific design and reports; city and outside-agency charges; and construction. A public plan may address only part of the first two categories.

    Depending on the property and current checklist, you may need survey information, utility layouts, energy documentation, foundation details or specialist reports. Ask which are already included and which must be prepared separately. Contractor pricing, material purchases and construction scheduling are not zHeight's service.

    For financing choices rather than construction-price promises, see our California ADU financing guide.

    When custom ADU design may be the better fit

    A standard plan is worth considering when its layout meets your household's needs and can fit the property without prohibited revisions. A custom design may be more suitable if essential layout changes, unusual access, slope, trees, easements or utility conditions prevent use of the accepted design. These are review questions, not automatic disqualifications across every jurisdiction.

    Start with the parcel and the household's needs—not a floor plan chosen in isolation. An attached addition or garage conversion may follow a different path from the detached programs discussed here. Our ADU and JADU design overview explains the alternatives.

    Before you commit: a homeowner checklist

    1. Confirm the permitting jurisdiction: an incorporated city or the county's unincorporated area.
    2. Ask whether the exact plan and version remain accepted under the applicable code cycle.
    3. Check plan-use permission, licensing conditions and whether changes are allowed.
    4. Compare the footprint with site boundaries, easements, access and utilities.
    5. Get the current site-specific checklist and identify missing drawings or reports.
    6. Separate consulting fees, agency charges and construction bids in your budget.
    7. Submit the complete property-specific application; do not begin construction based on plan pre-approval alone.

    For common documentation gaps, see our ADU plan-check corrections checklist.

    How zHeight helps with design and permits

    zHeight provides residential design and permit consulting. Within the agreed scope, we review planning questions, prepare or coordinate permit drawings and supporting documentation, include energy compliance in our own permit sets, and coordinate submission and plan-check responses. We first establish whether a standard-plan pathway or a custom design suits the property and project.

    zHeight does not build ADUs, act as a general contractor, hire construction crews or manage subcontractors. The homeowner contracts separately for construction. We do not claim that our designs are city-pre-approved merely because a city offers a pre-approved program.

    Get Your Free Quote

    Frequently asked questions

    Are pre-approved ADU plans the same as a building permit?

    No. Pre-approval concerns the standard plan under a local program. Your property still needs the required site-specific application, agency review and building permit. Union City explicitly requires a separate building permit application for each site.

    Are pre-approved ADU plans free in California?

    Some local programs offer free plan files, but there is no single price across all programs. For example, Santa Clara County offers specified county plans free for residents of unincorporated Santa Clara County, and San Ramon offers its city permit-ready plans free to San Ramon homeowners. Free plan files do not mean free permits, site documentation or construction.

    How much money or time do pre-approved ADU plans save?

    There is no universal saving or guaranteed approval time. A program may reduce repeated review of the standard building design or the cost of obtaining drawings. Site documentation, utility coordination, agency review and fees still remain. Compare the complete scope and current local checklist before estimating savings.

    Can I change a pre-approved ADU floor plan?

    Check the exact local program before changing anything. San Ramon states its city plans cannot be revised and must be permitted as designed. Union City's checklist says site-specific modifications disqualify a project from its pre-approved program. A custom design may be more suitable when changes are essential.

    Can I use a county plan inside an incorporated city?

    Do not assume so. The Santa Clara County program described here serves unincorporated county properties. If your property is inside a city, confirm acceptance with that city's permitting agency before using another jurisdiction's plan.

    Do pre-approved plans include everything needed for my lot?

    Not necessarily. Santa Clara County calls for a project-specific site plan, energy calculations and a roof truss design. San Ramon requires site information, permits, fees and outside-agency approvals. Obtain the current checklist for the chosen plan and property.

    Does zHeight build ADUs or act as the general contractor?

    No. zHeight is a residential design and permit consulting company. Its work concerns design drawings, permit documentation, included energy compliance and permit coordination within the agreed scope. Homeowners hire their own contractor separately for construction.

    Official sources and verification

    Official program pages and checklist reviewed November 16, 2026. Programs, accepted plan versions and fees can change; confirm requirements with the permitting agency before committing to a design. This guide is educational, not legal advice or a guarantee of permit approval.