Union City, CA · Alameda County · 2026 Guide
    Site-specific permits and utility coordination

    Union City ADU
    Design & Permits

    Last updated:

    Union City’s ADU resources distinguish a pre-approved detached design from the separate building permit required for a real property. The City provides an ADU zoning and design checklist alongside its pre-approved program. zHeight serves Union City homeowners with ADU/JADU design, garage conversion plans, additions, remodels and permit coordination.

    Service area
    Union City, Alameda County
    Design services
    ADU · JADU · Addition · Remodel
    Local guidance
    Official City sources below
    Property approval
    Confirm with City reviewers

    Facts verified November 16, 2026 against official City of Union City sources · see Sources below

    Lot Eligibility

    Where to Start With Your Union City ADU

    Utility coordination is a practical Union City starting point. The City checklist directs applicants to Alameda County Water District, Union Sanitary District and PG&E before building permit submission to discuss extensions, capacity and connection fees. The pre-approved program separately requires a site-specific application; changing a pre-approved design disqualifies it from that program.

    Property-Specific Planning Review

    Union City Planning: 510-675-5379 or planning@unioncity.org. A general city guide cannot determine a particular lot’s approval.

    Get Your Free Quote

    Check the Property First

    Confirm zoning, existing structures and the proposed ADU type with Planning rather than relying on the size of the lot alone.

    Two Pre-Approval Paths

    Qualified professionals can seek independent plan pre-approval or submit a site-specific plan for pre-approval concurrently with a building permit application.

    Start With Utility Providers

    The City checklist specifically names water, sanitary sewer and electricity providers. Connection capacity and fees require provider confirmation, not a design-plan assumption.

    ADU Types & Sizes

    Union City ADU Options and Local Code Checks

    The general ADU checklist is dated January 13, 2023. Some provisions, including unit counts, heights, parking and JADU occupancy, may have changed. Use it as a document-preparation reference and have Planning confirm current standards; this guide does not treat those older limits as current entitlements.

    Backyard unit

    Detached ADU

    Max Size
    Check current City limits
    Setbacks
    Review parcel and easements
    Height
    Confirm applicable height

    Attached ADU

    Max Size
    Check existing home and scope
    Setbacks
    Review proposed footprint
    Height
    Confirm applicable height
    Within the home

    JADU

    Max Size
    Confirm JADU requirements
    Setbacks
    Review existing structure
    Height
    Existing building review

    Garage Conversion

    Max Size
    Assess existing permitted space
    Setbacks
    Verify existing footprint
    Height
    Existing building review
    Pre-approved program
    Detached ADU plans: independent pre-approval or a site-specific application
    Union City — Pre-Approved ADU Program
    Building permit
    Each specific site still requires a separate building permit application
    Union City — Pre-Approved ADU Program
    Plan modifications
    Site-specific modifications disqualify a pre-approved plan from the program
    Union City — Pre-Approved ADU Program
    Application documents — dated checklist
    Include ADU/JADU zoning and design standards checklists; confirm latest versions
    Union City — ADU Information and Checklist (January 13, 2023)
    Utility coordination — dated checklist
    Contact Alameda County Water District, Union Sanitary District and PG&E before submission
    Union City — ADU Information and Checklist (January 13, 2023)
    JADU description — dated checklist
    Within single-family habitable floor area or garage space, with a kitchenette; may share a bathroom
    Union City — ADU Information and Checklist (January 13, 2023)
    Local code reference — dated checklist
    Municipal Code Chapter 18.34; verify current text with Planning
    Union City — ADU Information and Checklist (January 13, 2023)

    Permit Process

    How to Prepare an ADU Permit Application in Union City

    Utility coordination is a practical Union City starting point. The City checklist directs applicants to Alameda County Water District, Union Sanitary District and PG&E before building permit submission to discuss extensions, capacity and connection fees. The pre-approved program separately requires a site-specific application; changing a pre-approved design disqualifies it from that program. zHeight coordinates design drawings and City comments; the City makes the approval decision. Do not budget a guaranteed review time based only on a standard plan.

    #1: Confirm before submission

    The general ADU checklist is dated January 13, 2023. Some provisions, including unit counts, heights, parking and JADU occupancy, may have changed. Use it as a document-preparation reference and have Planning confirm current standards; this guide does not treat those older limits as current entitlements.

    #2: Official City contact

    Union City Planning: 510-675-5379 or planning@unioncity.org

    1. 01

      Confirm the Parcel and Scope

      Review your address, existing structures and proposed ADU type with Union City staff. Use the official resources below and confirm the latest application checklist.

    2. 02

      Resolve Local Site Questions

      Utility coordination is a practical Union City starting point. The City checklist directs applicants to Alameda County Water District, Union Sanitary District and PG&E before building permit submission to discuss extensions, capacity and connection fees. The pre-approved program separately requires a site-specific application; changing a pre-approved design disqualifies it from that program.

    3. 03

      Prepare Coordinated Permit Plans

      zHeight develops the design and permit drawings for the agreed scope, coordinates structural documentation and in-house energy compliance where applicable, and identifies any separately commissioned survey or specialist reports.

    4. 04

      Submit, Respond and Plan Construction

      Follow Union City’s current application instructions, respond to reviewer corrections and confirm assessed fees. After permit issuance, hire your own licensed California general contractor; zHeight remains available for plan questions and permit revisions.

    Cost Guide

    Union City ADU Design Costs and Permit Fees

    Separate the design fee from City charges, utility costs, specialist reports and your contractor’s construction price. A flat-fee drawing package is not a total building budget.

    zHeight Permit Plans

    $7,999 / from $4,888

    749 sq ft detached ADU permit set: $7,999. 420 sq ft JADU garage conversion offer: from $4,888, subject to scope. Custom ADUs, additions and remodels receive a project-specific quote.

    City and Utility Fees

    Confirm with agencies

    Ask Union City and the relevant utility providers for current project charges. No unverified local fee totals are presented here.

    Construction

    Separate contractor bid

    zHeight provides design and permitting, not construction. Surveys and specialist reports are separately scoped; obtain a construction bid from a licensed California general contractor.

    Verify Permit Fees Before Budgeting

    Use the official City sources below to confirm the current fee schedule and any project-specific requirements. A fee exemption, where applicable, is not an exemption from all permit, utility or specialist costs.

    Want a cost estimate for your specific lot and ADU type?

    Get a Free Project Estimate

    Why zHeight

    Local-Code Coordination for Union City Homeowners

    Utility coordination is a practical Union City starting point. The City checklist directs applicants to Alameda County Water District, Union Sanitary District and PG&E before building permit submission to discuss extensions, capacity and connection fees. The pre-approved program separately requires a site-specific application; changing a pre-approved design disqualifies it from that program.

    zHeight serves this city; the guide does not imply a local branch office, City endorsement or guaranteed approval. We confirm the current requirements for your specific address before finalizing the permit scope.

    Residential ADU design illustration; not a Union City project claim
    Local requirements
    DIY / GenericA standard design without a parcel review
    zHeight PackageCurrent checklist and parcel questions identified before finalizing plans
    Scope and costs
    DIY / GenericDesign, City fees and construction combined
    zHeight PackageDesign and permit scope separated from agency and contractor costs
    Review comments
    DIY / GenericCorrections left uncoordinated
    zHeight PackagePermit drawing responses coordinated with City reviewers

    Speed through complete first submissions

    Incomplete plan sets are a common reason applications bounce at intake. zHeight prepares an organized, complete submission — all required sheets, structural calculations and Title 24 CF1R included.

    Design & permitting only — not the builder

    zHeight provides design drawings, structural engineering, Title 24 compliance and permit processing. After your permit is issued, you hire a licensed California general contractor; we answer plan questions and handle permit revisions.

    FAQ

    Union City ADU Questions, Answered

    Have a question not answered here?

    Our team typically responds within one business day.

    zHeight — Union City

    Plan Your Union City Residential Project

    Get a free quote for ADU, JADU, garage conversion, addition or remodel design and permits in Union City. Share your address and goals so we can review the right local requirements.

    Sources & last verified (November 16, 2026)

    Rules change — confirm current requirements and fees with the City of Union City before designing or budgeting. zHeight is not affiliated with the City.