Last updated:
Union City’s ADU resources distinguish a pre-approved detached design from the separate building permit required for a real property. The City provides an ADU zoning and design checklist alongside its pre-approved program. zHeight serves Union City homeowners with ADU/JADU design, garage conversion plans, additions, remodels and permit coordination.
Facts verified November 16, 2026 against official City of Union City sources · see Sources below
Lot Eligibility
Utility coordination is a practical Union City starting point. The City checklist directs applicants to Alameda County Water District, Union Sanitary District and PG&E before building permit submission to discuss extensions, capacity and connection fees. The pre-approved program separately requires a site-specific application; changing a pre-approved design disqualifies it from that program.
Union City Planning: 510-675-5379 or planning@unioncity.org. A general city guide cannot determine a particular lot’s approval.
Get Your Free QuoteConfirm zoning, existing structures and the proposed ADU type with Planning rather than relying on the size of the lot alone.
Qualified professionals can seek independent plan pre-approval or submit a site-specific plan for pre-approval concurrently with a building permit application.
The City checklist specifically names water, sanitary sewer and electricity providers. Connection capacity and fees require provider confirmation, not a design-plan assumption.
ADU Types & Sizes
The general ADU checklist is dated January 13, 2023. Some provisions, including unit counts, heights, parking and JADU occupancy, may have changed. Use it as a document-preparation reference and have Planning confirm current standards; this guide does not treat those older limits as current entitlements.
| Rule | Union City | Source |
|---|---|---|
| Pre-approved program | Detached ADU plans: independent pre-approval or a site-specific application | Union City — Pre-Approved ADU Program |
| Building permit | Each specific site still requires a separate building permit application | Union City — Pre-Approved ADU Program |
| Plan modifications | Site-specific modifications disqualify a pre-approved plan from the program | Union City — Pre-Approved ADU Program |
| Application documents — dated checklist | Include ADU/JADU zoning and design standards checklists; confirm latest versions | Union City — ADU Information and Checklist (January 13, 2023) |
| Utility coordination — dated checklist | Contact Alameda County Water District, Union Sanitary District and PG&E before submission | Union City — ADU Information and Checklist (January 13, 2023) |
| JADU description — dated checklist | Within single-family habitable floor area or garage space, with a kitchenette; may share a bathroom | Union City — ADU Information and Checklist (January 13, 2023) |
| Local code reference — dated checklist | Municipal Code Chapter 18.34; verify current text with Planning | Union City — ADU Information and Checklist (January 13, 2023) |
Permit Process
Utility coordination is a practical Union City starting point. The City checklist directs applicants to Alameda County Water District, Union Sanitary District and PG&E before building permit submission to discuss extensions, capacity and connection fees. The pre-approved program separately requires a site-specific application; changing a pre-approved design disqualifies it from that program. zHeight coordinates design drawings and City comments; the City makes the approval decision. Do not budget a guaranteed review time based only on a standard plan.
#1: Confirm before submission
The general ADU checklist is dated January 13, 2023. Some provisions, including unit counts, heights, parking and JADU occupancy, may have changed. Use it as a document-preparation reference and have Planning confirm current standards; this guide does not treat those older limits as current entitlements.
#2: Official City contact
Union City Planning: 510-675-5379 or planning@unioncity.org
Confirm the Parcel and Scope
Review your address, existing structures and proposed ADU type with Union City staff. Use the official resources below and confirm the latest application checklist.
Resolve Local Site Questions
Utility coordination is a practical Union City starting point. The City checklist directs applicants to Alameda County Water District, Union Sanitary District and PG&E before building permit submission to discuss extensions, capacity and connection fees. The pre-approved program separately requires a site-specific application; changing a pre-approved design disqualifies it from that program.
Prepare Coordinated Permit Plans
zHeight develops the design and permit drawings for the agreed scope, coordinates structural documentation and in-house energy compliance where applicable, and identifies any separately commissioned survey or specialist reports.
Submit, Respond and Plan Construction
Follow Union City’s current application instructions, respond to reviewer corrections and confirm assessed fees. After permit issuance, hire your own licensed California general contractor; zHeight remains available for plan questions and permit revisions.
Cost Guide
Separate the design fee from City charges, utility costs, specialist reports and your contractor’s construction price. A flat-fee drawing package is not a total building budget.
$7,999 / from $4,888
749 sq ft detached ADU permit set: $7,999. 420 sq ft JADU garage conversion offer: from $4,888, subject to scope. Custom ADUs, additions and remodels receive a project-specific quote.
Confirm with agencies
Ask Union City and the relevant utility providers for current project charges. No unverified local fee totals are presented here.
Separate contractor bid
zHeight provides design and permitting, not construction. Surveys and specialist reports are separately scoped; obtain a construction bid from a licensed California general contractor.
Verify Permit Fees Before Budgeting
Use the official City sources below to confirm the current fee schedule and any project-specific requirements. A fee exemption, where applicable, is not an exemption from all permit, utility or specialist costs.
Want a cost estimate for your specific lot and ADU type?
Get a Free Project EstimateWhy zHeight
Utility coordination is a practical Union City starting point. The City checklist directs applicants to Alameda County Water District, Union Sanitary District and PG&E before building permit submission to discuss extensions, capacity and connection fees. The pre-approved program separately requires a site-specific application; changing a pre-approved design disqualifies it from that program.
zHeight serves this city; the guide does not imply a local branch office, City endorsement or guaranteed approval. We confirm the current requirements for your specific address before finalizing the permit scope.

| What you need | DIY / Generic | zHeight Package |
|---|---|---|
| Local requirements | A standard design without a parcel review | Current checklist and parcel questions identified before finalizing plans |
| Scope and costs | Design, City fees and construction combined | Design and permit scope separated from agency and contractor costs |
| Review comments | Corrections left uncoordinated | Permit drawing responses coordinated with City reviewers |
Incomplete plan sets are a common reason applications bounce at intake. zHeight prepares an organized, complete submission — all required sheets, structural calculations and Title 24 CF1R included.
zHeight provides design drawings, structural engineering, Title 24 compliance and permit processing. After your permit is issued, you hire a licensed California general contractor; we answer plan questions and handle permit revisions.
FAQ
Have a question not answered here?
Our team typically responds within one business day.
zHeight — Union City
Get a free quote for ADU, JADU, garage conversion, addition or remodel design and permits in Union City. Share your address and goals so we can review the right local requirements.
Sources & last verified (November 16, 2026)
Rules change — confirm current requirements and fees with the City of Union City before designing or budgeting. zHeight is not affiliated with the City.