    Building an ADU in the City of San Mateo means working with Zoning Code Chapter 27.19, updated by Ordinance 2026-02. Compliant ADUs need only a building permit — no planning hearing — and the first 800 sq ft of ADU living area doesn't count against your floor area ratio.

    Side & rear setback
    4 ft (new construction)
    FAR-exempt ADU area
    First 800 sq ft
    New ADU permit fee
    $2,831.57 flat
    Parking required
    None (SMMC 27.19.060)

    Facts verified 2026-10-09 against official City of San Mateo sources · see Sources below

    Lot Eligibility

    Can I Build an ADU on My San Mateo Property?

    San Mateo's ADU chapter applies in all zoning districts that allow residential uses. A single-family lot can combine up to three units: an attached or conversion ADU, a detached ADU and a JADU. Rules as of 2026-10-09.

    Check My Lot

    Instant eligibility check — San Mateo rules as of 2026-10-09

    Up to Three Units per Lot

    One attached or conversion ADU + one detached new-construction ADU + one JADU (within the walls of the single-family home).

    No Parking, No Hearing

    No off-street parking is required for any ADU or JADU, and a garage converted to an ADU doesn't need replacement parking. Compliant projects are approved ministerially and cannot be appealed.

    Second-Story Design Rules

    Nonexempt ADUs must meet the R-1 daylight plane, use obscured glass on second-story windows within 5 ft of a neighbor, keep exterior stairs 5 ft from lot lines, and skip rooftop decks.

    ADU Types & Sizes

    What Can I Build on My San Mateo Lot?

    San Mateo regulates ADU size mainly through floor area ratio rather than a fixed cap: the first 800 sq ft is FAR-exempt, and beyond that the ADU must fit the lot's remaining floor area and stay smaller than the main home.

    Most popular

    Detached ADU

    Max Size
    800 sq ft FAR-exempt
    Setbacks
    4 ft side & rear
    Height
    18 ft plate / 24 ft peak

    Attached ADU

    Max Size
    Not larger than the main home
    Setbacks
    4 ft side & rear
    Height
    24 ft plate / 32 ft peak
    Lowest city fee

    JADU

    Max Size
    Up to 500 sq ft
    Setbacks
    Within the house
    Height
    Existing structure

    Garage Conversion

    Max Size
    Existing walls + 150 sq ft
    Setbacks
    None — same footprint
    Height
    Existing structure
    Detached ADU height
    18 ft to top plate line, 24 ft to roof peak
    SMMC §27.19.060(c)
    Attached ADU height
    24 ft to top plate line, 32 ft to roof peak
    SMMC §27.19.060(c)
    Side & rear setback (new)
    4 ft minimum
    SMMC §27.19.060(d)
    FAR-exempt ADU living area
    Up to 800 sq ft
    SMMC §27.19.060(b)
    JADU maximum
    500 sq ft
    City ADU page
    Parking
    None required
    SMMC §27.19.060(f)
    Impact fees
    None for ADUs ≤750 sq ft
    SMMC §27.19.050(b)
    Minimum rental term
    30 consecutive days
    SMMC §27.19.030

    Permit Process

    How to Get an ADU Permit in San Mateo

    San Mateo approves compliant ADUs ministerially — a building permit and related permits, with no planning application or public notice. The City runs a Code Consultation Counter Monday–Friday, 8:30am–11:30am, and publishes a Pre-Approved ADU Plans submittal guide and plans gallery on its ADU page.

    #1: Going over 800 sq ft

    Above 800 sq ft, the ADU counts against the lot's FAR. On lots already near their FAR limit, a larger ADU may not fit — check remaining floor area before design.

    #2: Second-story design standards

    Two-story nonexempt ADUs must meet daylight plane, obscured glazing, stair setback and deck-size rules in SMMC 27.19.060(g). Missing these is a common source of corrections.

    1. 01

      Zoning & Lot Check

      Look up your zoning district and FEMA flood zone using the City's tools, and check for heritage trees. Planning answers zoning questions at (650) 522-7212 or planning@cityofsanmateo.org.

    2. 02

      Pick the ADU Combination

      Decide which of the three allowed units you're adding — attached/conversion ADU, detached ADU, JADU — and confirm how much FAR remains if you want more than 800 sq ft.

      An ADU cannot have more living area than the main home unless it is a State Exempt ADU of up to 800 sq ft.

    3. 03

      Design & Engineering

      Permit-ready plan set with site plan, floor plans, elevations, structural calculations and Title 24 CF1R. For two-story ADUs, zHeight applies the daylight plane, glazing and deck rules from SMMC 27.19.060(g) before submittal.

    4. 04

      Submit the Building Permit

      Submit following the City's ADU and JADU Plan Submittal Guide, including the separate address assignment the code requires. San Mateo Consolidated Fire reviews fire requirements; reach them at (650) 522-7940.

    5. 05

      Plan Review & Corrections

      Building Division questions go to (650) 522-7172 or building.info@cityofsanmateo.org. zHeight responds to every City correction letter until the permit is approved.

    6. 06

      Permit Issued — Hire Your Contractor

      Pay fees and receive the building permit. You hire a licensed California general contractor to build; zHeight stays available for plan questions and permit revisions.

    Cost Guide

    How Much Does an ADU Cost in San Mateo?

    San Mateo is one of the few cities that publishes flat ADU permit fees. Construction pricing isn't government data, so we don't list a range — get bids from licensed contractors once plans are approved.

    Design & Permit Plans

    From $7,999

    zHeight flat-fee 749 sq ft ADU permit set ($7,999) or JADU garage conversion set ($4,888); custom projects quoted individually. Includes structural calculations and Title 24 CF1R.

    City Permit Fee (flat)

    $2,831.57

    New ADU $2,831.57, ADU remodel $2,031.12, JADU $1,454.02 per unit, per the City's ADU page. No impact fees for ADUs 750 sq ft or smaller.

    Construction

    Contractor bid

    Paid to your licensed general contractor, not zHeight. Not an official figure — varies by size, site and finishes.

    Verify Permit Fees Before Budgeting

    The City lists flat ADU/JADU permit fees and links its Comprehensive Fee Schedule from the ADU page. Under SMMC §27.19.050, ADUs of 750 sq ft or less pay no impact fees; conversion ADUs pay no utility connection fee or capacity charge. Confirm current amounts with the Building Division at (650) 522-7172 before budgeting.

    Want a cost estimate for your specific lot and ADU type?

    Get a Free Project Estimate

    Why zHeight

    Designing Around San Mateo's FAR and Second-Story Rules

    San Mateo's limits are less about a single size cap and more about floor area ratio and two-story design standards. Getting those right on the first submittal is where a complete plan set pays off.

    Local work: zHeight has prepared permit plans for homes in San Mateo, including the addition and remodel shown below. For an ADU, we check your remaining FAR, confirm whether a rear-third detached location avoids setbacks, and apply the 27.19.060(g) design standards before the City sees the plans.

    zHeight addition and remodel project in San Mateo, CA
    zHeight addition & remodel project, San Mateo — see our projects
    What you needDIY / GenericzHeight Package
    FAR analysisSize picked without checking remaining floor areaRemaining FAR calculated so the ADU size works on your lot
    Second-story standardsDaylight plane and glazing rules found at plan check27.19.060(g) standards built into the design
    Structural engineeringGeneric calcsSite-specific structural calculations by a licensed engineer
    Title 24 CF1ROrdered separatelyIncluded in every permit set
    Plan check correctionsYou answer the City's commentszHeight responds until the permit is issued

    Speed through complete first submissions

    Incomplete plan sets are a common reason applications bounce at intake. zHeight prepares an organized, complete submission — all required sheets, structural calculations and Title 24 CF1R included.

    Design & permitting only — not the builder

    zHeight provides design drawings, structural engineering, Title 24 compliance and permit processing. After your permit is issued, you hire a licensed California general contractor; we answer plan questions and handle permit revisions.

    FAQ

    San Mateo ADU Questions, Answered

    Have a question not answered here?

    Our team typically responds within one business day.

    zHeight — San Mateo

    Ready to Plan Your San Mateo ADU?

    We prepare the complete permit package — design drawings, structural, Title 24 CF1R and correction responses — sized to your lot's FAR and San Mateo's design standards.