Los Altos, CA · Santa Clara County · 2026 Guide
    Tree protection, surveys and creek-aware plans

    Los Altos ADU
    Design & Permits

    Last updated:

    For a Los Altos ADU, the City’s submittal checklist is a useful starting point: a surveyed site plan, tree protection information, utility details and coordinated building drawings. zHeight serves Los Altos homeowners with ADU and JADU design, garage conversions, residential additions, remodels and permit coordination. This page concerns the City of Los Altos, not a determination for Los Altos Hills.

    Service area
    Los Altos, Santa Clara County
    Design services
    ADU · JADU · Addition · Remodel
    Local guidance
    Official City sources below
    Property approval
    Confirm with City reviewers

    Facts verified November 16, 2026 against official City of Los Altos sources · see Sources below

    Lot Eligibility

    Where to Start With Your Los Altos ADU

    Los Altos asks for creeks or waterways on, adjacent to or within 50 feet of the project site to be shown with the top of bank. Its checklist also calls for a site survey using City benchmark data and a tree protection plan identifying trees over 4 inches in diameter measured 48 inches above grade. These are submission details, not a claim that every tree is protected or every creek creates the same setback.

    Property-Specific Planning Review

    Los Altos Building Division: bldpermit@losaltosca.gov. A general city guide cannot determine a particular lot’s approval.

    Get Your Free Quote

    Survey Before the Layout

    The City’s checklist calls for a licensed survey using benchmark data. Site plans show property lines, easements, structure separations and elevations.

    Draw Tree Protection

    Number trees, list species and sizes, identify protected status, and show protective fencing for protected trees. Tree size alone does not establish protection status.

    Creeks and Utilities Need Details

    The site plan checklist asks for nearby waterways and sewer/backflow information. Resolve those conditions before finalizing a detached ADU location.

    ADU Types & Sizes

    Los Altos ADU Options and Local Code Checks

    The City checklist mixes current cover-sheet code references with older technical citations elsewhere. Confirm applicable code editions and project-specific requirements with Building. We have not verified current ADU size, height or setback limits from a current local ordinance, so no universal numeric limits are claimed here.

    Backyard unit

    Detached ADU

    Max Size
    Check current City limits
    Setbacks
    Review parcel and easements
    Height
    Confirm applicable height

    Attached ADU

    Max Size
    Check existing home and scope
    Setbacks
    Review proposed footprint
    Height
    Confirm applicable height
    Within the home

    JADU

    Max Size
    Confirm JADU requirements
    Setbacks
    Review existing structure
    Height
    Existing building review

    Garage Conversion

    Max Size
    Assess existing permitted space
    Setbacks
    Verify existing footprint
    Height
    Existing building review
    Application channel
    Checklist directs plans and documents to bldpermit@losaltosca.gov; confirm current submission instructions
    Los Altos — ADU Plan Check Submittal Requirements
    Site survey
    Prepared by a licensed land surveyor using City benchmark data
    Los Altos — ADU Plan Check Submittal Requirements
    Site plan
    Show easements, setbacks, utilities, structures and building/finished-floor elevations
    Los Altos — ADU Plan Check Submittal Requirements
    Creek documentation
    Show creeks/waterways on, adjacent to or within 50 ft of the project, including top of bank
    Los Altos — ADU Plan Check Submittal Requirements
    Tree documentation
    Identify trees over 4 in diameter measured 48 in above grade, species, size and protection status
    Los Altos — ADU Plan Check Submittal Requirements
    Electrical plans
    Show panel locations and provide electrical load calculations
    Los Altos — ADU Plan Check Submittal Requirements
    Current fees and applications
    Use City Forms & Handouts for the current fee schedule and separate ADU/addition/remodel documents
    Los Altos — Forms, Handouts and Current Fee Schedule

    Permit Process

    How to Prepare an ADU Permit Application in Los Altos

    Los Altos asks for creeks or waterways on, adjacent to or within 50 feet of the project site to be shown with the top of bank. Its checklist also calls for a site survey using City benchmark data and a tree protection plan identifying trees over 4 inches in diameter measured 48 inches above grade. These are submission details, not a claim that every tree is protected or every creek creates the same setback. zHeight coordinates design drawings and City comments; the City makes the approval decision. Do not budget a guaranteed review time based only on a standard plan.

    #1: Confirm before submission

    The City checklist mixes current cover-sheet code references with older technical citations elsewhere. Confirm applicable code editions and project-specific requirements with Building. We have not verified current ADU size, height or setback limits from a current local ordinance, so no universal numeric limits are claimed here.

    #2: Official City contact

    Los Altos Building Division: bldpermit@losaltosca.gov

    1. 01

      Confirm the Parcel and Scope

      Review your address, existing structures and proposed ADU type with Los Altos staff. Use the official resources below and confirm the latest application checklist.

    2. 02

      Resolve Local Site Questions

      Los Altos asks for creeks or waterways on, adjacent to or within 50 feet of the project site to be shown with the top of bank. Its checklist also calls for a site survey using City benchmark data and a tree protection plan identifying trees over 4 inches in diameter measured 48 inches above grade. These are submission details, not a claim that every tree is protected or every creek creates the same setback.

    3. 03

      Prepare Coordinated Permit Plans

      zHeight develops the design and permit drawings for the agreed scope, coordinates structural documentation and in-house energy compliance where applicable, and identifies any separately commissioned survey or specialist reports.

    4. 04

      Submit, Respond and Plan Construction

      Follow Los Altos’s current application instructions, respond to reviewer corrections and confirm assessed fees. After permit issuance, hire your own licensed California general contractor; zHeight remains available for plan questions and permit revisions.

    Cost Guide

    Los Altos ADU Design Costs and Permit Fees

    Separate the design fee from City charges, utility costs, specialist reports and your contractor’s construction price. A flat-fee drawing package is not a total building budget.

    zHeight Permit Plans

    $7,999 / from $4,888

    749 sq ft detached ADU permit set: $7,999. 420 sq ft JADU garage conversion offer: from $4,888, subject to scope. Custom ADUs, additions and remodels receive a project-specific quote.

    City and Utility Fees

    Confirm with agencies

    Ask Los Altos and the relevant utility providers for current project charges. No unverified local fee totals are presented here.

    Construction

    Separate contractor bid

    zHeight provides design and permitting, not construction. Surveys and specialist reports are separately scoped; obtain a construction bid from a licensed California general contractor.

    Verify Permit Fees Before Budgeting

    Use the official City sources below to confirm the current fee schedule and any project-specific requirements. A fee exemption, where applicable, is not an exemption from all permit, utility or specialist costs.

    Want a cost estimate for your specific lot and ADU type?

    Get a Free Project Estimate

    Why zHeight

    Local-Code Coordination for Los Altos Homeowners

    Los Altos asks for creeks or waterways on, adjacent to or within 50 feet of the project site to be shown with the top of bank. Its checklist also calls for a site survey using City benchmark data and a tree protection plan identifying trees over 4 inches in diameter measured 48 inches above grade. These are submission details, not a claim that every tree is protected or every creek creates the same setback.

    zHeight serves this city; the guide does not imply a local branch office, City endorsement or guaranteed approval. We confirm the current requirements for your specific address before finalizing the permit scope.

    Residential ADU design illustration; not a Los Altos project claim
    Local requirements
    DIY / GenericA standard design without a parcel review
    zHeight PackageCurrent checklist and parcel questions identified before finalizing plans
    Scope and costs
    DIY / GenericDesign, City fees and construction combined
    zHeight PackageDesign and permit scope separated from agency and contractor costs
    Review comments
    DIY / GenericCorrections left uncoordinated
    zHeight PackagePermit drawing responses coordinated with City reviewers

    Speed through complete first submissions

    Incomplete plan sets are a common reason applications bounce at intake. zHeight prepares an organized, complete submission — all required sheets, structural calculations and Title 24 CF1R included.

    Design & permitting only — not the builder

    zHeight provides design drawings, structural engineering, Title 24 compliance and permit processing. After your permit is issued, you hire a licensed California general contractor; we answer plan questions and handle permit revisions.

    FAQ

    Los Altos ADU Questions, Answered

    Have a question not answered here?

    Our team typically responds within one business day.

    zHeight — Los Altos

    Plan Your Los Altos Residential Project

    Get a free quote for ADU, JADU, garage conversion, addition or remodel design and permits in Los Altos. Share your address and goals so we can review the right local requirements.

    Sources & last verified (November 16, 2026)

    Rules change — confirm current requirements and fees with the City of Los Altos before designing or budgeting. zHeight is not affiliated with the City.